Utshishkau – Sector 1
Saguenay-Lac-Saint-Jean
Sector 1 is about 540 km² and could generate 392 MW of wind power.

Sector 1 – 392 MW
The energy that’s produced will be sent to the existing Chamouchouane substation in La Doré.

Key project phases
- 2025 to 2029
Preliminary project
- 2026 to 2029
Government approvals, including the submission of the impact assessment
- 2029 to 2032
Construction
- 2032
Full commissioning
Area map
The map shows the preliminary layout of the wind turbines in sector 1 of the Utshishkau wind farm project. This area could generate 392 MW of wind power. The energy that’s produced will be sent to Chamouchouane substation.
A few highlights:
72 potential wind farm sites are being studied. Depending on the study results and consultations, between 5 and 16 of them will be ruled out.
About 75% of the logging roads needed for the project are already built.
An underground collector system will run under the access roads.
This wind turbine layout plan is preliminary, so it may change based on the findings of the environmental and technical studies and discussions with local communities.
Preliminary Layout Plan


Let’s talk!
Do you have any ideas, suggestions, questions or comments about the Utshishkau wind farm project?
Info-Project Line:
1 833 822-3029- affairesregionales@hydroquebec.com
Wind energy resource development | Utshishkau area
Stay informed about the status of wind power development projects in this area.